Before buying a ready or resale DLF Independent Floor in Gurugram, verify the Occupation Certificate (OC), confirm no unauthorized balcony/stilt enclosures violate sanctioned plans, test lift AMC and power-backup capacity, and obtain a RWA/maintenance no-dues certificate.
Why Physical + Document Inspection Matters on Independent Floors
In established colonies like DLF Phase 1, Phase 2, Phase 3, or Phase 4, individual floor owners sometimes modify balconies, enclose stilt areas, or alter shafts after handover. Checking the approved plan against the physical unit protects you from municipal notices and bank valuation cuts.
6 Checks Before Signing a Token Receipt
- Occupation Certificate (OC) & Sanctioned Plan: Confirm the building has a valid OC and the floor layout matches the sanctioned drawing.
- Stilt & Shaft Integrity: Ensure stilt parking bays are unobstructed and no illegal room has blocked fire or ventilation shafts.
- Lift Maintenance & Shared Costs: Ask existing floor neighbours how lift AMC, common electricity meter bills, and terrace waterproofing are split.
- Sanctioned Power Load & Backup: Verify kVA load per floor (crucial for multi-split/VRV AC setups) and whether DG backup is individual or shared.
- Water Supply & Overhead Tank Allocation: Check municipal/HUDA water line pressure and separate overhead tank capacity per floor.
- Clear Title & Bank Loan Foreclosure: Obtain copies of previous registered deeds, mutation, and bank NOC/LOD if mortgaged.